
Preparation: まずマシンの電源がオフになっていることを確認します, すべての油圧が解放されます.
Place the wheel loader on a stable surface and secure it to prevent any accidental movement.
分解: Carefully remove the hydraulic pump from the machine, following the manufacturer’s guidelines. Take note of the pump’s orientation and connections to ensure correct reinstallation later. Disassemble the pump, separating its various components.
検査: Thoroughly inspect each component for signs of wear, ダメージ, or corrosion. Pay close attention to the pump housing, 歯車, 羽根, シール, とベアリング. Replace any damaged or worn-out parts with the corresponding components from the VOE 11172710 rebuild kit.
クリーニング: Clean all the components using an appropriate cleaning solvent to remove dirt, デブリ, and old lubricants. Ensure that all parts are completely free of contaminants before reassembly.
再組み立て: Follow the provided specifications and instructions to assemble the hydraulic pump. Lubricate the components with the recommended hydraulic oil or grease during reassembly. Pay attention to the correct alignment and torque specifications for each component.
テスト: Once the pump is reassembled, it is essential to test its functionality.
Connect the hydraulic pump to the machine’s hydraulic system and conduct a series of tests to ensure proper operation. Verify that the pump generates the required hydraulic pressure and there are no leaks or abnormal noises.
インストール: If the rebuilt pump passes all tests, reinstall it into the machine following the manufacturer’s guidelines. Make sure all connections are secure and properly tightened.

トンキーマシンのロゴ









