About   Contact    |   

hot sale Control Unit Computer Board ECU G6000-3823351A Electronic Module etc-C3 G60003823351A - Tonkee Machinery

Diesel Engine/

hot sale Control Unit Computer Board ECU G6000-3823351A Electronic Module etc-C3 G60003823351A

G6000-3823351A Control Unit

Operating voltage: DC 12V-24V (wide voltage range, adapting to the original power supply system of etc-C3 series equipment).
Signal response speed: ≤25ms, ensuring timely and accurate processing of sensor signals and control commands.

  • Product Details

What is the full product name, model, and core identity?

A1: The full product name is Control Unit Computer Board ECU, with the primary model G6000-3823351A (alternate model: G60003823351A, with the same performance and compatibility). It is a dedicated electronic module categorized under the etc-C3 series, serving as the core control component for specific engineering machinery electronic systems.

Which equipment models is this ECU computer board compatible with?

A2: This ECU electronic module (G6000-3823351A/G60003823351A) is specifically calibrated for etc-C3 series engineering machinery (including but not limited to etc-C3 excavators/loaders). It fully matches the original equipment’s electrical architecture, wiring harness interfaces, and communication protocols, ensuring seamless integration without additional modifications.

Are there brand-new and refurbished versions available for this product?

A3. Yes, we provide two options to meet different customer needs for cost and quality:
  • Brand-new ECU Computer Board: Manufactured in strict accordance with the original factory’s technical standards, using 100% new industrial-grade components. It undergoes full-process quality control and is 100% consistent with the original part in terms of performance and compatibility.
  • Factory-refurbished ECU Computer Board: Undergoes professional disassembly, full inspection of core components, replacement of aging/damaged parts (all replacement parts meet original-grade standards), and strict calibration and testing (including 120-hour continuous operation test). It meets the original performance requirements and offers higher cost-effectiveness.

Prev:

Next:

Leave a Reply

Leave a message